Case Study 1

HYBRID VS TRADITIONAL GENERATOR
LOAD MANAGEMENT

20 kVA generator load management

Genset 20 kVA

HYBRID GENERATOR load management

- 1750 €

fuel costs
per month

-7,1 ton

CO2 emission
per month
MGTP 24000/30 TH

An incredible saving!

Based on a generator being used with
75% load for 2 hours - Full construction site
50% load for 3 hours - Mixers/Pumps
20% load for 6 hours - Offices/Tools
10% load for 13 hours - Lights/Cameras

60 kVA generator load management

Genset 60 kVA

HYBRID GENERATOR load management

- 5780 €

fuel costs
per month

-19,7 ton

CO2 emission
per month
MGTP 45000/60 TH

An incredible saving!

Based on a generator being used with
75% load for 2 hours - Full construction site
50% load for 3 hours - Mixers/Pumps
20% load for 6 hours - Offices/Tools
10% load for 13 hours - Lights/Cameras

TRIME s.r.l. - © copyright 2023 - All right reserved - P. IVA 00541350187